Wednesday, December 20, 2023
Transducer working way
Solenoid Valve
Job in Dubai Qatar Saudi Oman Bahrain
Urgently Requires For Bahrain Leading Paint Manufacturing Company
- Export Manager
- Assistant Manager
- R&d Executives(Paint)
- Tinter Man (Colour Matcher)
- Sales Executives (For Saudi)
E mail CV To rec1@tradesmen.in / cvs@tradesmen.in
How To Apply for This Job: Read the Job Details carefully, If the Job Requirement matches your Profile, Apply by Sending Resume with Document to the Email ID Mentioned on the Job Ad / JD or Call them or Contact office on the mentioned Address.
Read the ad to know more about the vacancies and the qualifications / Experience reqd. | Read the Ad carefully before you apply
If you have any friends, relatives, colleagues or acquaintances who will be matching the below profile, we request you to please share these details to them.
[Note: We try to provide genuine jobs .We dont have any role in Recruitment Process.Please enquiry about the Recruiting Agent before you accept the Job Offer / Pay any Money to them]
Tuesday, December 19, 2023
What does a transducer do in a compressor?
chiller Control Device and function
Monday, December 18, 2023
Urgent Required for Ghulf Job in Dubai Saudi Qatar Oman
Sunday, December 17, 2023
To Apply for This Job: Read the Job Details carefully, If the Job Requirement matches your Profile, Apply by Sending Resume with Document to the Email ID Mentioned on the Job Ad / JD or Call them or Contact office on the mentioned Address.Read the ad to know more about the vacancies and the qualifications / Experience reqd. | Read the Ad carefully before you applyIf you have any friends, relatives, colleagues or acquaintances who will be matching the below profile, we request you to please share these details to them.[Note: We try to provide genuine jobs .We dont have any role in Recruitment Process.Please enquiry about the Recruiting Agent before you accept the Job Offer / Pay any Money to them]
Friday, December 15, 2023
चिलर में कुछ सामान्य खराबियाँ निम्नलिखित हो सकती हैं:
एयर कंडीशनर (AC) में गैस चार्ज करने के लिए कुछ कदम होते हैं:
मोटर को टेस्ट करने के लिए निम्नलिखित कदम अनुसरण किए जा सकते हैं
Urgent Job
ong Term Kuwait Jobs – Koc Operation And Maintenance Project
Client Interview On 17th December
Venue Address:- Anuptech (Rabale) Plot No.r-421, Ttc Industrial Area, Opp. Fire Brigade, Midc, Rabale, Navi Mumbai, Maharashtra 400701
Land Line : +91 2261041786 / 708 / 701
Mob Num : +91 84249 40831 / 91539 25786
Email : Kuwait.mena1@gmail.com
How To Apply for This Job: Read the Job Details carefully, If the Job Requirement matches your Profile, Apply by Sending Resume with Document to the Email ID Mentioned on the Job Ad / JD or Call them or Contact office on the mentioned Address.
Read the ad to know more about the vacancies and the qualifications / Experience reqd. | Read the Ad carefully before you apply
If you have any friends, relatives, colleagues or acquaintances who will be matching the below profile, we request you to please share these details to them.
[Note: We try to provide genuine jobs .We dont have any role in Recruitment Process.Please enquiry about the Recruiting Agent before you accept the Job Offer / Pay any Money to them
Chiller Starting Process
Commissioning Testing process
The testing process for an Air Handling Unit (AHU) typically involves several steps to ensure its proper functioning and performance. Here is a general outline of the AHU testing process:
Pre-Commissioning Activities: a. Review Specifications: Familiarize yourself with the AHU specifications, project requirements, and applicable codes and standards. b. Inspect Installation: Verify that the AHU is installed correctly, including proper alignment, connection to ductwork, electrical connections, and insulation.
Inspection and Pre-Testing: a. Visual Inspection: Inspect the AHU for any visible defects, damage, or improper installation, such as loose components, broken seals, or missing insulation. b. Pre-Functional Checks: Ensure that all fans, dampers, filters, heating/cooling coils, and control devices associated with the AHU are in the correct positions and operate properly.
Functional Testing: a. Start-Up Procedures: Follow the manufacturer's recommended start-up procedures to activate the AHU and bring it to the operational state. b. Airflow Verification: Measure and record the airflow rates at various sections of the AHU, including intake, supply, and exhaust. Compare the measured values to the specified requirements. c. Temperature and Humidity Control: Test the AHU's temperature and humidity control capabilities by adjusting the setpoints and monitoring the output air conditions. d. Filter Testing: Verify that the installed filters are of the correct type, size, and efficiency. Check for any air bypass around the filters and inspect for filter leaks or damage. e. Fan Performance: Measure the fan motor power consumption, airflow pressure, and fan speed to ensure they meet the specified requirements. f. Damper Operation: Test the operation of all dampers within the AHU, including fresh air, return air, and exhaust air dampers, to ensure they open and close properly. g. Heating/Cooling Coil Testing: If applicable, test the heating and cooling coils' performance to verify their ability to provide the required heating or cooling capacity.
System Integration: a. Interoperability Testing: Ensure that the AHU integrates properly with other components of the HVAC system, such as chillers, boilers, or building management systems. Test communication and coordination between these components. b. Control System Testing: Verify the operation of the AHU's control system, including temperature and humidity sensors, actuators, and control sequences.
Documentation and Reporting: a. Test Reports: Document all tests conducted, including the test parameters, results, and any deviations from the acceptance criteria. b. Non-Conformance Reports: Identify and report any issues or discrepancies discovered during testing, along with recommended corrective actions. c. As-Built Documentation: Update the AHU documentation, including drawings, schematics, and specifications, to reflect any changes or modifications made during the testing and commissioning process.
Acceptance and Handover: a. Review and Approval: Submit the test reports, non-conformance reports, and other relevant documentation to the project owner or authorized personnel for review and approval. b. Rectification and Re-Testing: If any issues are identified, work with the project team to rectify them and conduct re-testing as required. c. Final Acceptance: Once all tests and rectification work are completed successfully, obtain formal acceptance from the project owner or client.
Please note that this is a general outline, and the specific steps and requirements may vary based on the project specifications, AHU model, and industry standards. It is important to refer to the manufacturer's instructions, project documentation, and consult with relevant experts to ensure a proper testing and commissioning process for the AHU.
Damper CW and CCW
Thursday, December 14, 2023
Ghulf Job
-
Determining Duct Air Flow in CFM using to Pressure Sensor by Imran To calculate Air Flow in Cubic Feet per Minute (CFM), determine the Fl...
-
Avoid the 5 Common HVAC Installation Mistakes Choosing the Wrong Installer. One of the first mistakes homeowners or businesses make...