ahisr.blogspot.com

Wednesday, December 20, 2023

Transducer working way

A transducer converts one form of energy into another. In the context of sensors, it typically transforms a physical quantity (like pressure, temperature, or light) into an electrical signal. For instance, in a microphone, a transducer converts sound waves (mechanical energy) into electrical signals. The transducer's mechanism varies depending on the type of sensor, but the fundamental concept involves the conversion of one form of energy to another for measurement or transmission.

Solenoid Valve

A solenoid valve controls the flow of a fluid by using an electromagnetic coil to move a plunger or a piston, opening or closing the valve. When an electric current passes through the coil, it generates a magnetic field, attracting the movable component and allowing or blocking the flow of the fluid through the valve.

Job in Dubai Qatar Saudi Oman Bahrain

Urgently Requires For Bahrain Leading Paint Manufacturing Company

  1. Export Manager  
  2. Assistant Manager  
  3. R&d Executives(Paint)  
  4. Tinter Man (Colour Matcher)  
  5. Sales Executives (For Saudi) 

E mail CV To rec1@tradesmen.in / cvs@tradesmen.in 

How To Apply for This Job: Read the Job Details carefully, If the Job Requirement matches your Profile, Apply by Sending Resume with Document  to the Email ID Mentioned on the Job Ad / JD or Call them or Contact office on the mentioned Address.

Read the ad to know more about the vacancies and the qualifications / Experience reqd. | Read the Ad carefully before you apply

If you have any friends, relatives, colleagues or acquaintances who will be matching the below profile, we request you to please share these details to them.

[Note: We try to provide genuine jobs .We dont have any role in Recruitment Process.Please enquiry about the Recruiting Agent before you accept the Job Offer / Pay any Money to them]

Tuesday, December 19, 2023

What does a transducer do in a compressor?

What does a transducer do in a compressor?
A pressure transducer, often called a pressure transmitter, is an electromechanical device designed to measure pressure with a high degree of accuracy. Pressure transducers sense applied pressure and output an electrical signal by using a combination of mechanical and electical compntents.

chiller Control Device and function

A chiller control device regulates the operation of a chiller, which is a refrigeration system used to cool or dehumidify air or fluid. The main functions of the control device include:



1. **Temperature Control:** Monitors and adjusts the chiller's output to maintain a set temperature.

2. **Pressure Control:** Manages the refrigerant pressure within the chiller system to optimize efficiency and safety.

3. **Flow Control:** Regulates the flow of chilled water or other cooling fluids circulating through the system.

4. **Compressor Control:** Manages the operation of the compressor to match the cooling demand and prevent unnecessary energy consumption.

5. **Fault Detection and Diagnostics:** Identifies and communicates issues within the chiller system, enabling timely maintenance.

6. **Energy Efficiency Optimization:** Implements strategies to enhance the chiller's energy efficiency, such as variable speed drives and optimized start/stop sequences.

7. **Remote Monitoring and Control:** Allows operators to monitor and control the chiller system remotely for convenience and quick response to changes or issues.

Overall, the chiller control device ensures the chiller operates efficiently, maintains desired temperatures, and responds appropriately to varying loads or environmental conditions.

Monday, December 18, 2023

Urgent Required for Ghulf Job in Dubai Saudi Qatar Oman

To Apply for This Job: Read the Job Details carefully, If the Job Requirement matches your Profile, Apply by Sending Resume with Document  to the Email ID Mentioned on the Job Ad / JD or Call them or Contact office on the mentioned Address.Read the ad to know more about the vacancies and the qualifications / Experience reqd. | Read the Ad carefully before you applyIf you have any friends, relatives, colleagues or acquaintances who will be matching the below profile, we request you to please share these details to them.[Note: We try to provide genuine jobs .We dont have any role in Recruitment Process.Please enquiry about the Recruiting Agent before you accept the Job Offer / Pay any Money to them]

Sunday, December 17, 2023

Friday, December 15, 2023

चिलर में कुछ सामान्य खराबियाँ निम्नलिखित हो सकती हैं:

चिलर में कुछ सामान्य खराबियाँ निम्नलिखित हो सकती हैं:

1. **रेफ्रिजरेंट लीकेज़:** यह एक सामान्य समस्या है जो चिलर में हो सकती है। रेफ्रिजरेंट की लीकेज़ से चिलर की प्रदर्शन क्षमता कम हो सकती है और ठंडाई प्रभावित हो सकता है।

2. **कंप्रेसर समस्याएँ:** कंप्रेसर में गड़बड़ी या कंप्रेसर की बंद हो जाने से चिलर का प्रदर्शन प्रभावित हो सकता है। यह चिलर की कार्यक्षमता को नकारात्मक तरीके से प्रभावित कर सकता है।

3. **फ़ैन की समस्याएँ:** फ़ैन में गड़बड़ी, चक्रवात में तेज ध्वनि या किसी अन्य प्रकार की समस्याओं से चिलर का प्रदर्शन प्रभावित हो सकता है।

4. **संदर्भन सेंसर समस्याएँ:** अक्सर चिलर में संदर्भन सेंसरों की खराबी या विफलता होती है, जो तापमान या प्रवाह की गणना में समस्याएँ उत्पन्न कर सकती हैं।

5. **धुंधला पानी का फ्लो:** अगर चिलर की कूलिंग टावर या कूलिंग प्रणाली में धुंधला पानी हो, तो इससे सिस्टम में संक्षेपण हो सकता है और चिलर का प्रदर्शन निर्दिष्ट स्तर पर नहीं रह सकता।

जब भी ऐसी समस्याएँ होती हैं, चिलर की समस्या का निर्धारण करने और सुधारने के लिए प्रशिक्षित तकनीशियन या मैन्युफैक्चरर से संपर्क करना सर्वोत्तम होता है।

एयर कंडीशनर (AC) में गैस चार्ज करने के लिए कुछ कदम होते हैं:

एयर कंडीशनर (AC) में गैस चार्ज करने के लिए कुछ कदम होते हैं:

1. **सुनिश्चित करें कि आपके पास सही उपकरण हैं:** गैस चार्जिंग के लिए आपको AC के लिए गैस की नली, मानोमेटर, और गैस की ड्रम या टैंक की आवश्यकता होती है।

2. **विशेषज्ञ से संपर्क करें:** AC में गैस भरने से पहले, एक विशेषज्ञ या तकनीशियन से संपर्क करके यह सुनिश्चित करें कि क्या आपके AC में गैस की कमी है और कितनी गैस डालनी चाहिए।

3. **सुरक्षा:** AC को बंद करें और उसे बिजली से अलग करें। सुनिश्चित करें कि AC ठंडा हो चुका है और सभी बटन और नोजल सुरक्षित हैं।

4. **गैस की नली जोड़ें:** गैस की नली को AC के गैस के धागे से जोड़ें।

5. **मानोमेटर उपयोग करें:** गैस ड्रम से AC में गैस डालने के लिए मानोमेटर का उपयोग करें। सही दबाव पर गैस को AC में भरें।

6. **जाँच और परीक्षण:** गैस भरने के बाद, AC को चालू करके ठंडाई की क्षमता की जाँच करें। सुनिश्चित करें कि गैस सही तरीके से फ्लो हो रही है और सिस्टम ठीक से काम कर रहा है।

यह सुनिश्चित करने के लिए की आपके द्वारा गैस चार्जिंग की प्रक्रिया सुरक्षित और सही ढंग से हो रही है। अगर आपको किसी भी प्रकार की शंका हो, तो बेहतर होगा की आप इसे एक प्रोफेशनल तकनीशियन से करवाएं।

मोटर को टेस्ट करने के लिए निम्नलिखित कदम अनुसरण किए जा सकते हैं

मोटर को टेस्ट करने के लिए निम्नलिखित कदम अनुसरण किए जा सकते हैं:

1. **सुरक्षा पहल:** मोटर को टेस्ट करने से पहले सुनिश्चित करें कि आप उपयुक्त सुरक्षा उपकरण जैसे कि अदरक या हेलमेट पहने हो।


2. **वोल्टमीटर का उपयोग:** मोटर के वायरिंग या टर्मिनल्स के बीच वोल्टमीटर की मदद से वोल्टेज चेक करें। सुनिश्चित करें कि उपयुक्त वोल्टेज मोटर को पहुंच रहा है।

3. **ओहममीटर का उपयोग:** मोटर के वायरिंग के बीच ओहममीटर का उपयोग करके सर्किट की स्थिरता की जाँच करें। सही ओह्म मापने के लिए मोटर की तकनीकी जानकारी का इस्तेमाल करें।

4. **फ्री रनिंग टेस्ट:** अगर संभव हो, तो मोटर को फ्री रनिंग (बिना लोड) के साथ चालू करके उसकी कामक्षमता की जांच करें। किसी अनियमित ध्वनि, गतिविधि या उदाहरणीय गर्मी की जांच करें।

5. **लोड टेस्ट:** यदि संभव हो, तो मोटर को उसकी मैकेनिकल लोड के साथ टेस्ट करें। इससे आप उसकी वास्तविक कामक्षमता और संभावित समस्याओं की जांच कर सकते हैं।

6. **डीफेक्ट या समस्या की जांच:** यदि कोई डीफेक्ट या समस्या मिलती है, तो उसे नोट करें और उसे सुधारने के लिए एक प्रोफेशनल तकनीशियन की सलाह लें।

यह सुनिश्चित करने के लिए कि मोटर सही तरह से काम कर रहा है और किसी भी समस्या को पहचानने के लिए टेस्टिंग प्रक्रिया को सावधानी से और निर्देशों के अनुसार किया जा रहा है।

Urgent Job

ong Term Kuwait Jobs – Koc Operation And Maintenance Project 

Client Interview On 17th December 

Venue Address:- Anuptech (Rabale) Plot No.r-421, Ttc Industrial Area, Opp. Fire Brigade, Midc, Rabale, Navi Mumbai, Maharashtra 400701

Land Line : +91 2261041786 / 708 / 701

Mob Num : +91 84249 40831 / 91539 25786 

Email : Kuwait.mena1@gmail.com 

How To Apply for This Job: Read the Job Details carefully, If the Job Requirement matches your Profile, Apply by Sending Resume with Document  to the Email ID Mentioned on the Job Ad / JD or Call them or Contact office on the mentioned Address.

Read the ad to know more about the vacancies and the qualifications / Experience reqd. | Read the Ad carefully before you apply

If you have any friends, relatives, colleagues or acquaintances who will be matching the below profile, we request you to please share these details to them.

[Note: We try to provide genuine jobs .We dont have any role in Recruitment Process.Please enquiry about the Recruiting Agent before you accept the Job Offer / Pay any Money to them

Chiller Starting Process

Starting a chiller for the first time involves several steps to ensure proper functionality and safety:

1. **Inspection:** Check the chiller system for any visible damage, leaks, or loose connections. Ensure that all components are in place and nothing obstructs the chiller's operation.

2. **Review Documentation:** Refer to the manufacturer's manual for specific startup procedures. This will outline steps unique to your chiller model.

3. **Power Up:** Ensure the chiller is connected to a stable power source and follow the sequence provided in the manual for turning on the chiller and associated components.

4. **Adjust Settings:** Set the operating parameters according to the manufacturer's guidelines. This includes temperature settings, flow rates, and any other relevant parameters.

5. **Start-Up Sequence:** Initiate the start-up sequence as per the manufacturer's instructions. This may involve starting auxiliary systems first before engaging the main chiller unit.

6. **Monitor Operations:** Once started, monitor the chiller closely for any abnormal noises, vibrations, or irregularities. Check for leaks and ensure that all systems are functioning correctly.

7. **System Testing:** Conduct system tests to ensure the chiller operates within its specified parameters. Verify that it reaches the desired temperatures and that all safety mechanisms are operational.

8. **Documentation:** Keep a record of the startup procedure, noting any adjustments made and the system's performance during the initial start-up.

If you're unsure about any specific steps or details regarding your chiller, it's advisable to consult with a certified technician or the manufacturer's support for guidance tailored to your equipment. Safety and precision are key when starting a chiller for the first time.

Commissioning Testing process

The testing process for an Air Handling Unit (AHU) typically involves several steps to ensure its proper functioning and performance. Here is a general outline of the AHU testing process:

  1. Pre-Commissioning Activities: a. Review Specifications: Familiarize yourself with the AHU specifications, project requirements, and applicable codes and standards. b. Inspect Installation: Verify that the AHU is installed correctly, including proper alignment, connection to ductwork, electrical connections, and insulation.

  2. Inspection and Pre-Testing: a. Visual Inspection: Inspect the AHU for any visible defects, damage, or improper installation, such as loose components, broken seals, or missing insulation. b. Pre-Functional Checks: Ensure that all fans, dampers, filters, heating/cooling coils, and control devices associated with the AHU are in the correct positions and operate properly.

  3. Functional Testing: a. Start-Up Procedures: Follow the manufacturer's recommended start-up procedures to activate the AHU and bring it to the operational state. b. Airflow Verification: Measure and record the airflow rates at various sections of the AHU, including intake, supply, and exhaust. Compare the measured values to the specified requirements. c. Temperature and Humidity Control: Test the AHU's temperature and humidity control capabilities by adjusting the setpoints and monitoring the output air conditions. d. Filter Testing: Verify that the installed filters are of the correct type, size, and efficiency. Check for any air bypass around the filters and inspect for filter leaks or damage. e. Fan Performance: Measure the fan motor power consumption, airflow pressure, and fan speed to ensure they meet the specified requirements. f. Damper Operation: Test the operation of all dampers within the AHU, including fresh air, return air, and exhaust air dampers, to ensure they open and close properly. g. Heating/Cooling Coil Testing: If applicable, test the heating and cooling coils' performance to verify their ability to provide the required heating or cooling capacity.

  4. System Integration: a. Interoperability Testing: Ensure that the AHU integrates properly with other components of the HVAC system, such as chillers, boilers, or building management systems. Test communication and coordination between these components. b. Control System Testing: Verify the operation of the AHU's control system, including temperature and humidity sensors, actuators, and control sequences.

  5. Documentation and Reporting: a. Test Reports: Document all tests conducted, including the test parameters, results, and any deviations from the acceptance criteria. b. Non-Conformance Reports: Identify and report any issues or discrepancies discovered during testing, along with recommended corrective actions. c. As-Built Documentation: Update the AHU documentation, including drawings, schematics, and specifications, to reflect any changes or modifications made during the testing and commissioning process.

  6. Acceptance and Handover: a. Review and Approval: Submit the test reports, non-conformance reports, and other relevant documentation to the project owner or authorized personnel for review and approval. b. Rectification and Re-Testing: If any issues are identified, work with the project team to rectify them and conduct re-testing as required. c. Final Acceptance: Once all tests and rectification work are completed successfully, obtain formal acceptance from the project owner or client.

Please note that this is a general outline, and the specific steps and requirements may vary based on the project specifications, AHU model, and industry standards. It is important to refer to the manufacturer's instructions, project documentation, and consult with relevant experts to ensure a proper testing and commissioning process for the AHU.

Damper CW and CCW

In the context of mechanical systems like HVAC or airflow control, CW (clockwise) and CCW (counterclockwise) often refer to the direction of rotation for a damper.

- **CW (Clockwise):** Turning the damper in a clockwise direction typically means closing or reducing the airflow. This action restricts or shuts off the passage for air or fluid flow through the system.

- **CCW (Counterclockwise):** Conversely, rotating the damper counterclockwise often means opening or increasing the airflow. It allows more air or fluid to pass through the system by adjusting the damper's position accordingly.

The specific functionality of a damper (whether it's a manual or motorized damper, its purpose within the system, etc.) can influence the effect of turning it CW or CCW. Always refer to the system's documentation or labels to ensure you're adjusting the damper in the intended direction for the desired effect on airflow or fluid flow.

Thursday, December 14, 2023

Ghulf Job

 










Transducer working way

A transducer converts one form of energy into another. In the context of sensors, it typically transforms a physical quantity (like pressure...